I haven’t gotten as a lot completed on the lavatory over the past two days as you’d most likely count on, however understand that I don’t work on Wednesdays. ? However on Tuesday, I did make some progress with the tile on the lavatory ground.
I had been undecided on what I needed to do on the ground in the bathroom space. Once I began tiling the ground, the plan had been to make use of the small 2 x 2 tile solely on the bathe ground, after which use the big tile on the ground in the bathroom space.
However after I determined to make use of the little brushed brass Schluter strip as a separator between the big ground tile and the two x 2 bathe ground tile, that threw a wrench into my plans. Y’all know the way a lot I really like (want) symmetry, so I couldn’t do a brushed brass transition strip on the left facet of the bath space (the bath will go in entrance of the mural), and never do a transition strip on the correct facet of the bath.
I briefly thought of doing a transition strip on the correct facet after which persevering with on with the big tiles in the bathroom space, however that would appear random and unnecessary. The transition strip solely is sensible (in my thoughts) if there’s a real transition within the flooring used on both facet of the transition strip.
So I went with symmetry, together with the transition strip and the two x 2 ground tiles in the bathroom space.
Right here’s a view of the 2 areas. I critically love symmetry. It sooths my thoughts. ?
If this have been a tiling job that I may have completed by beginning on the again wall and dealing my manner out the door, it may have been completed in at some point.
However had I completed that, I virtually actually would have been left with reduce tiles proper on the transition strip. And it was essential to me that I’ve entire tiles on either side of that Schluter strip. That signifies that I needed to begin with the row of tiles on the Schluter strip…
After which work on the rows perpendicular to that first one, beginning on the facet wall.
As soon as I had that a lot completed, I needed to cease as a result of that space was getting fairly tight for me engaged on my knees, plus my 5-gallon bucket of mortar, plus my 2-gallon bucket of water. I ran out of room to maneuver with out stepping on and kneeling on tiles to work, and that wasn’t an choice. So I needed to cease and let these tiles dry in order that I may return (in the present day) and have the ability to stroll on and kneel on these tiles to do the remainder of the ground.
It normally comes again to chew me after I say, “Right this moment, I’m going to get X, Y, and Z completed,” however I’m going to go forward and make a aim. By the top of in the present day, I’d prefer to have the remainder of the tile put in in the bathroom space, all the extra mortar cleaned up, and have the bathe ground grouted. That’s the aim, so we’ll see simply how shut I can get.
There shall be one massive manner during which the bathe and the bathroom space received’t be symmetrical. You might have observed on my “to do” record for this lavatory that one of many constructing tasks listed is to construct cupboards on this rest room space. (You’ll be able to see my grasp “to do” lists for the lavatory and the house fitness center right here.) I made a decision on this design after I was wrestling forwards and backwards between having a window seat between the 2 vanities, or filling that space with extra storage.
I lastly determined that I actually desire a window seat, however I couldn’t sacrifice that a lot storage space with out discovering one other place for storage. The bathroom space was the proper place. That space is big, and even when I lose 14 inches of depth alongside the again wall, it’ll nonetheless a lot giant. So the cupboards will go right here…
These cupboards received’t be walnut just like the vanities. As a result of I would like this space and the bathe to be as symmetrical as attainable, these shall be painted white to mix in with the white tiled partitions. So I shall be sacrificing excellent symmetry, however for the sake of a load of storage in an space the place there’s loads of room to spare, I feel it’ll be completely value it, particularly if it means I can get a reasonably window seat in the primary a part of the lavatory the place it actually counts.
As a facet observe, I needed to let y’all know that my palms have been simply positive after Tuesday’s tiling. I put coconut oil on my palms, after which placed on two layers of the disposable blue nitrile gloves from Dwelling Depot, and it labored completely. The outer layer did get a few holes and tears (however not as many as I had anticipated), however the interior layer remained completely intact, so nothing bought by way of to my palms.
Once I took the gloves off on the finish of the day, my palms have been waterlogged and wrinkly like I had spent a whole day in a swimming pool, however that went away after about an hour. And I’d moderately have waterlogged that return to regular in an hour as an alternative of dried, cracking pores and skin and painful, swollen palms that take over per week to return to regular. So double-gloving with disposable nitrile gloves for the win!
Addicted 2 Adorning is the place I share my DIY and adorning journey as I rework and adorn the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do the vast majority of the work on the home on my own. You’ll be able to be taught extra about me right here.