The skirting is totally put in on the workshop, and I can’t imagine how a lot of a distinction it made! I knew it will make a distinction, however to my eye, this skirting has fully modified the look of the constructing and turned it from a utilitarian shed right into a cute little constructing. It’s not fairly to “cottage” standing but, however this skirting went a great distance in the direction of that objective.
I’ve already shared fairly a bit concerning the course of of putting in this skirting, together with merchandise used and why. In the event you missed that publish, you may learn it right here: Including Skirting To The Workshop, Half 1
Whereas I did end the set up, the skirting isn’t fully completed but. I nonetheless must caulk, paint, and add vents. I can’t neglect about air flow! However I needed to order vents on-line, and I do have them, however I haven’t had an opportunity to put in them but. I didn’t purchase something fancy. They’re simply easy small vents with screens to maintain pests out. These are those I purchased (affiliate hyperlink). They’re type of small, so I’ll be placing a complete of 5 vents within the skirting across the constructing. Why 5? No purpose besides that I purchased a package deal of 5. 😀
I present the entire course of, from begin to end, on this video. It’s an extended video, however I ended up with virtually 4 hours of video from this venture that I needed to edit.
However for these of you who need the photographs, let’s get again to the method. I don’t have rather more to share in the best way of “how you can” on this venture. I just about shared all of that within the first publish. However I’ll share what I needed to take care of throughout this venture. This venture spanned a number of days, and that is Texas, so I used to be outdoors working in chilly climate, heat climate, dry climate, vibrant sunshine, rain, cloudy skies, and much and plenty of mud. I really feel like I type of skilled a full yr’s price of Texas seasons throughout this single venture.
I left off on the primary publish with me wheeling that lengthy 27-foot piece of skirting over into place by placing one finish on the furnishings dolly, and choosing up the opposite finish and dragging it simply to get it over by the constructing. And that’s the place I left it that night time. So the subsequent morning, I received as much as discover that it had rained, and the realm the place I wanted to work (which additionally wanted a trench dug the complete 27-foot size) was very muddy.
However I used to be decided, so I received down there and began digging the ditch for the skirting to suit into.
I’m not joking once I say it was muddy! I used to be coated in mud by the point I had the ditch dug, and my board was coated in mud additionally. I used to be so glad I used to be utilizing PVC boards. They’ll simply wash proper off with a bit water. I’m unsure that wooden would have escaped this unscathed.
With my trench dug, I had one other situation. Working on my own is commonly a problem. An additional set of arms would make issues a lot simpler, however I virtually by no means have an additional set of arms to assist me. And getting the lengthy skirting board to face up all the best way throughout by myself was seemingly inconceivable. By the point I’d get one find yourself, the opposite finish was falling over. Then the entire thing would fall over. I struggled with this for a couple of minutes earlier than I noticed a straightforward answer.
I grabbed a cinderblock and used it to prop the board up within the center, and that gave me the liberty I wanted to regulate the board and get the ends in place.
As soon as it was put in, it was a multitude. However once more, it’s PVC, so mud will wash proper off.
I needed to cease working for some time as a result of it poured down rain (oh good, extra mud!), however when it stopped, the solar got here out, and I received again to work. Subsequent up, I labored on the ramp finish of the constructing. Earlier than I may set up the skirting right here, I needed to shovel away plenty of dust and rocks that have been left from the concrete pour. I additionally needed to dig a shallow trench on this aspect.
However I additionally had to make use of my Dremel Multi-Max to chop away this plywood backing that was put there when the concrete ramp was poured. That is certainly one of my most useful instruments. In the event you don’t have one, you’ll find it right here (affiliate hyperlink). I discover myself utilizing this software consistently. It’s a type of issues that I purchased, after which puzzled how I went so lengthy with out it.
I additionally needed to chip away on the concrete as a result of it was fairly tough and jagged and my skirting boards didn’t match up towards it. Initially, I had a few 1/2-inch hole, which greater than I need to caulk, and lots massive for a mouse or in all probability even a rat to get into. And sure, I used my Multi-Max for that, too. That poor blade. 😀 However it did the trick!
And right here’s what that aspect appeared like as soon as it was in place.
I put a vertical trim piece proper up towards the ramp, and whereas I used to be capable of shut up most of that hole, that’s nonetheless large enough for bugs to get by, and probably even a mouse. I’ve learn that they will get by an area as small because the diameter of a pencil, so I’ll nonetheless must caulk this to shut up that hole fully.
By the point I received the areas on both aspect of the ramp completed, I had misplaced daylight. Y’all, I’m so bored with the solar happening at 5:30! I’m prepared for summer season daylight when the solar goes down at 9:00pm! However we don’t have that now, and I used to be decided to get the skirting completed earlier than closing up for the day, so I arrange my Jackery and Ring mild and saved on working. This Jackery is certainly one of my greatest current purchases. I drag this factor in all places to plug issues in with out having to make use of extension cords. It’s so useful!
So I used to be on the market, effectively after darkish, working by lamp mild powered by my Jackery. And naturally, this aspect was the toughest of all. I dug this trench about 4 instances earlier than I lastly received that board to sit down in there correctly. I used to be so pissed off, so drained, and so chilly, however the extra issues this gave me, the extra hardheaded and decided I received. There was no means I used to be going to pack it up with out ending.
And I did! I received every thing on that aspect completed proper at 9:00pm.
I had yet one more element I wished to handle the subsequent day. And I had a ravishing, sun-filled day to complete. I wished so as to add these nook trim items to cowl over the reduce ends of the PVC boards. I used 1″ x 2″ PVC boars for these corners, and put in the items vertically.
These will nonetheless want some caulk (as will the complete skirting), however I feel this trim provides it a cleaner and extra completed look.
Right here’s a have a look at the nook with the trim hooked up…
And with that remaining element in place, the skirting was fully put in! And naturally, I completed up after we had blinding solar with plenty of shadows, so the entrance is roofed in tree shadows making it a bit arduous to see. However I nonetheless assume you may see how a lot of an improve that skirting made to the constructing.
I simply love how this appears to be like. I’m going to attend to caulk and paint in order that I can do the skirting and entrance steps suddenly.
And right here’s a have a look at the again. I used to be capable of sweep off a lot of the dried mud, nevertheless it’s nonetheless fairly soiled. It’s going to take plenty of cleansing for me to have the ability to paint this skirting.
And right here’s a have a look at the opposite finish — the top I did by lamp mild. 😀
This was a giant job, for certain, and I’m so glad it’s completed! It wasn’t a tough job by any means, and I feel it will have been a lot simpler had I not needed to take care of all of that mud. However it’s completed now, and I can’t cease my little constructing. I’m so enthusiastic about the way it’s turning out!
If you wish to sustain with my 2025 listing of house targets (and my progress with hyperlinks to completed initiatives!) you may see that right here: 2025 Grasp Listing of Residence Targets
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and adorn the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do nearly all of the work on the home on my own. You’ll be able to study extra about me right here.