Alright, y’all. This would be the ultimate grasp rest room replace that I write. After this, the following submit I write about this rest room would be the ultimate, completed rest room with the entire earlier than and after tour.
I’m not promising when that shall be, however I’m hoping it is going to be earlier than Thanksgiving, which is subsequent Thursday. I’d love to return again after Thanksgiving and get proper to the house gymnasium and see if I can end that earlier than the tip of the 12 months. That’s the purpose, however I received’t be too laborious on myself if I’ve a couple of small unfinished issues in that room that want to hold over into subsequent 12 months.
However for now, right here’s the ultimate punch checklist for the lavatory. I nonetheless have to:
- Clear the water closet. (It’s completed, however every thing is roofed in mud proper now.)
- Prime and paint that one piece of trim that I maintain overlooking.
- Do some paint touchups on the remainder of the trim and wainscoting on this facet of the room.
- Take the plastic off of the door panes and add the privateness movie.
- Add a door pull on the sting of the door.
- Cowl the sunshine and change covers and get them put in.
- Caulk and paint the unfinished wainscoting panel below the vainness.
- End portray the plumbing below the vainness.
- End putting in the pulls on the storage cupboard.
- Paint the mirror body and hold the mirror.
- Caulk and paint the trim/backsplash.
- Set up and grout the tile backsplash/accent.
- Set up the lacking wainscoting panel below the vainness.
- Set up the tap and plumbing.
- Paint the plumbing components below the vainness.
- Sand, caulk, prime, and paint the final part of wainscoting.
- Hem the bathe curtain.
- Caulk one space within the bathe that I ignored.
That’s the ultimate, exhaustive checklist. If I counted accurately, that’s 18 issues left on the checklist. Fortunately, a few of these are fast and straightforward, and I can get them crossed off the checklist at present. Others aren’t fairly so fast and straightforward, so we’ll see if I can get all of that carried out earlier than Thanksgiving!
Addicted 2 Adorning is the place I share my DIY and adorning journey as I transform and beautify the 1948 fixer higher that my husband, Matt, and I purchased in 2013. Matt has M.S. and is unable to do bodily work, so I do the vast majority of the work on the home on my own. You may be taught extra about me right here.
I hope you’ll be part of me on my DIY and adorning journey! If you wish to comply with my tasks and progress, you may subscribe under and have every new submit delivered to your electronic mail inbox. That method you’ll by no means miss a factor!