A website has been chosen for a brand new $80-million Adelaide aquatic centre, with South Australian premier Peter Malinauskas revealing the brand new location in early September.
The brand new centre, designed by JPE Design Studio and Warren and Mahoney, will likely be constructed simply south of the prevailing parklands website, North Adelaide, on an oval within the south-western quadrant of Denise Norton Park.
The location has been chosen to exchange that of the getting older centre run by Adelaide Metropolis Council, which has been deemed not match for objective after lots of its amenities, together with diving boards and spas, have closed due to security issues. As soon as the 50-year-old facility is demolished, this website will likely be returned to neighborhood parkland.
The announcement follows a four-month public session interval, which garnered almost 1,000 submissions from locals and pool customers, with 55 % backing the south-west location. Malinauskas stated the south-western website was most popular as a result of it will outcome within the least variety of felled timber within the improvement course of.
Adelaide-based structure observe JPE Design Studio will work with aquatic and recreation structure specialists Warren and Mahoney to design a extra trendy and accessible facility, with the design section slated to take round 9 months.
Infrastructure minister Tom Koutsantonis stated the brand new website could have the identical footprint as the prevailing centre, as soon as it opens in 2026.
“By way of the square-meterage it would in all probability be like for like, however it could be a special configuration,” stated Koutsantonis. “What we’ve determined to do is to set it again to attempt to retain as many timber and vegetation as we presumably can.”
Malinauskas stated that the prevailing aquatic centre would keep open whereas the alternative facility is constructed, with development beginning in 2023.